+86 152 7537 5577

* Name
* Email
Phone
  • Angola+244
  • Afghanistan+93
  • Albania+355
  • Algeria+213
  • Andorra+376
  • Anguilla+1264
  • Antigua and Barbuda+1268
  • Argentina+54
  • Armenia+374
  • Ascension+247
  • Australia+61
  • Austria+43
  • Azerbaijan+994
  • Bahamas+1242
  • Bahrain+973
  • Bangladesh+880
  • Barbados+1246
  • Belarus+375
  • Belgium+32
  • Belize+501
  • Benin+229
  • Bermuda Is.+1441
  • Bolivia+591
  • Botswana+267
  • Brazil+55
  • Brunei+673
  • Bulgaria+359
  • Burkina+faso+226
  • Burma+95
  • Burundi+257
  • Cameroon+237
  • Canada+1
  • Cayman Is.+1345
  • Central African Republic+236
  • Chad+235
  • Chile+56
  • China+86
  • Colombia+57
  • Congo+242
  • Cook Is.+682
  • Costa Rica+506
  • Cuba+53
  • Cyprus+357
  • Czech Republic+420
  • Denmark+45
  • Djibouti+253
  • Dominica Rep.+1890
  • Ecuador+593
  • Egypt+20
  • EI Salvador+503
  • Estonia+372
  • Ethiopia+251
  • Fiji+679
  • Finland+358
  • France+33
  • French Guiana+594
  • Gabon+241
  • Gambia+220
  • Georgia+995
  • Germany+49
  • Ghana+233
  • Gibraltar+350
  • Greece+30
  • Grenada+1809
  • Guam+1671
  • Guatemala+502
  • Guinea+224
  • Guyana+592
  • Haiti+509
  • Honduras+504
  • Hongkong+852
  • Hungary+36
  • Iceland+354
  • India+91
  • Indonesia+62
  • Iran+98
  • Iraq+964
  • Ireland+353
  • Israel+972
  • Italy+39
  • Ivory Coast+225
  • Jamaica+1876
  • Japan+81
  • Jordan+962
  • Kampuchea (Cambodia )+855
  • Kazakstan+327
  • Kenya+254
  • Korea+82
  • Kuwait+965
  • Kyrgyzstan+331
  • Laos+856
  • Latvia+371
  • Lebanon+961
  • Lesotho+266
  • Liberia+231
  • Libya+218
  • Liechtenstein+423
  • Lithuania+370
  • Luxembourg+352
  • Macao+853
  • Madagascar+261
  • Malawi+265
  • Malaysia+60
  • Maldives+960
  • Mali+223
  • Malta+356
  • Mariana Is+1670
  • Martinique+596
  • Mauritius+230
  • Mexico+52
  • Moldova, Republic of+373
  • Monaco+377
  • Mongolia+976
  • Montserrat Is+1664
  • Morocco+212
  • Mozambique+258
  • Namibia+264
  • Nauru+674
  • Nepal+977
  • Netheriands Antilles+599
  • Netherlands+31
  • New Zealand+64
  • Nicaragua+505
  • Niger+227
  • Nigeria+234
  • North Korea+850
  • Norway+47
  • Oman+968
  • Pakistan+92
  • Panama+507
  • Papua New Cuinea+675
  • Paraguay+595
  • Peru+51
  • Philippines+63
  • Poland+48
  • French Polynesia+689
  • Portugal+351
  • Puerto Rico+1787
  • Qatar+974
  • Reunion+262
  • Romania+40
  • Russia+7
  • Saint Lueia+1758
  • Saint Vincent+1784
  • Samoa Eastern+684
  • Samoa Western+685
  • San Marino+378
  • Sao Tome and Principe+239
  • Saudi Arabia+966
  • Senegal+221
  • Seychelles+248
  • Sierra Leone+232
  • Singapore+65
  • Slovakia+421
  • Slovenia+386
  • Solomon Is+677
  • Somali+252
  • South Africa+27
  • Spain+34
  • Sri Lanka+94
  • St.Lucia+1758
  • St.Vincent+1784
  • Sudan+249
  • Suriname+597
  • Swaziland+268
  • Sweden+46
  • Switzerland+41
  • Syria+963
  • Taiwan+886
  • Tajikstan+992
  • Tanzania+255
  • Thailand+66
  • Togo+228
  • Tonga+676
  • Trinidad and Tobago+1809
  • Tunisia+216
  • Turkey+90
  • Turkmenistan+993
  • Uganda+256
  • Ukraine+380
  • United Arab Emirates+971
  • United Kiongdom+44
  • United States of America+1
  • Uruguay+598
  • Uzbekistan+233
  • Venezuela+58
  • Vietnam+84
  • Yemen+967
  • Yugoslavia+381
  • Zimbabwe+263
  • Zaire+243
  • Zambia+260
* Message

Understanding the Large Span Steel Structure Workshop

What is a Large Span Steel Structure Workshop?

Large Span Steel Structure Workshop is a spatial structure formed by connecting multiple members in a certain grid form through nodes.

 

Advantages:

① It has the advantages of small spatial force, light weight, high stiffness, and good seismic performance;

② Space work, simple transmission path, suitable for large-span and large column grid roof structures.

③ Lightweight structure with good economic indicators. Compared with flat steel roof trusses of the same span, when the span is less than 30m, the steel consumption can be saved by 5-10%; When the span is greater than 30m, it can save 10-20%.

④ Construction and installation are simple and fast. There are few types of members and nodes in the grid, and the size is not large. Transportation, storage, loading and unloading, and assembly are all relatively convenient.

⑤ The layout of the grid is flexible, and the roof system is flat, which is conducive to the installation of suspended ceilings, pipelines, and equipment

Usage:

Can be used as the roof of buildings such as sports arenas, cinemas, exhibition halls, waiting halls, stadium stands, awnings, hangars, and two-way large column spacing workshops